Belgrade Airport opens overhauled runway

NEWS FLASH


Belgrade Nikola Tesla Airport has reopened its overhauled runway 12L-30R (pictured) after a year and a half of work. The 3.400-metre runway, built in 1962, has been layered with high-resistance concrete, specially developed for the project, to improve its weight-bearing capacity. Furthermore, it has a new drainage and LED lighting system, as well as a new system of taxiways, including four rapid exit taxiways (RETs). The RETs enable aircraft to turn off at higher speeds than regular exit taxiways thereby minimising runway occupancy times. The project marks the runway’s most comprehensive overhaul to date. The inserted runway, which was opened last year, will now be used as a parallel taxiway and in case the main one is unable to be utilised for whatever reason. The two cannot be used at the same time due to their proximity, however, today they are being used alternatively. The inserted runway, as well as RETs 1-4, are expected to go out of service shortly for a certain period of time in order to transition the inserted runway into a parallel taxiway. Commenting on the development, the CEO of Belgrade Airport, Chivoine Rem, said, "With the completion of the reconstruction of the main runway, Nikola Tesla Airport enters a new phase of its development, enabling greater efficiency and even higher-quality service. This is one of the key steps toward our goal of making Belgrade a hub for Southeast Europe and facilitating the handling of fifteen million passengers annually by the end of the concession period".


Comments

  1. Anonymous11:06

    I still can't comprehend why Vinci chose to build a brand new runway so close to the old one so that the can not be used simultaneously.
    It seems very short sighted to me.

    ReplyDelete
    Replies
    1. Anonymous11:09

      It wasn't VINCI it was in the concession tender issued by the government of Serbia. Regardless of who won the tender to operate the airport they were required to build it there.

      Delete
    2. Anonymous11:10

      I think it was decided together with the GoS, so they are to blame even more. But who knows, those kind of deals are usually very untransparent in Serbia.

      Delete
    3. Anonymous11:17

      It seems that no one really cares about second runway (yet). The future railway line from airport to Expo complex will run across the future taxiways (after general aviation and E stands) to the second runway. A denivelation must be built for local road and railway, but so far that's not the case.

      Delete
    4. Anonymous11:19

      Sorry but when did anyone plan "future taxiways" there? Did you just make that up?

      Delete
    5. Anonymous11:27

      Well you have "PDR" (dunno the english word) for the whole airport complex. All land lots across the current road will be used for expansion.
      New runway must be connected to the current gates and terminals, but the railway line (which was initially supposed to go underground) is now obstructing the future development.

      Delete
    6. Anonymous11:28

      And PDR is can be revised...

      Delete
    7. Anonymous11:36

      Has the land around the airport needed for expansion been purchased yet?

      Delete
    8. Anonymous11:47

      This new runway (taxiway) it actually built so no need for other remote runway. With this parallel taxiway main runway will be used only for short time landing and take off. So, if plane need to go to opposite end of main runway for take off, it will not occupy it for 5-10 minutes, but only for one minute take off. It will use taxiway to taxi to other end. While he is taxiing, 2-3 more landings may occur. Also, when landing, airplane may release main runway with turning to rapid exit on pretty high speeds and than fully brake on parallel taxiway. That's why no extra remote runway is needed until 30-40 million passengers per year.

      Delete
    9. Anonymous13:10

      In 10 to 15 years runway will need reconstruction so they will move center of north runway 20 meters north so both runways can be used simultaneously similarly to LGW plans.

      Delete
    10. Anonymous13:59

      LGW handles 40 milion pax a year with a single runway and you guys are talking of BEG's need for the second runway. Reality check recommended.

      Delete
    11. Anonymous14:16

      LGW has been begging for decades to be allowed to build a 2nd runway.
      Basic knowledge recommended.

      Delete
    12. Anonymous16:57

      Anon 11:06 "I still can't comprehend"
      Plans for inserted runway were published about a decade ago. This solution has both pluses and minuses but people still trying to discuss it now that it's operational are out of touch with reality, to put it very mildly.

      Delete
    13. Anonymous19:36

      To anonymous at 11:47 are you some airline games enthusiast or you are dreaming to become a pilot? maybe this what you wrote can work when you are playing with the toys at home, but not in real life....

      Delete
    14. Anonymous16:09

      Building a new runway closer to Surčin, across the road which goes behind Cargo and hangars is very expensive since the land is owned by criminal establishment which asks a lot of money for the land.

      Delete
  2. Anonymous11:23

    Current traffic levels do not support the construction of a new runway but in future it probably will.
    It is a very important and expensive piece of infrastructure and they should have made sure that both the new and the refurbished old one could operate at the same time.

    ReplyDelete
    Replies
    1. Anonymous11:36

      +1

      Delete
    2. Anonymous11:44

      As we see with airports such at Gatwick its possible to have single runway operations many many many times what Belgrade airport will ever handle. Tbh the whole process of reconstruction has been rather poorly planned. But at least its all coming to an end now.

      Delete
    3. Anonymous12:08

      Gatwick airport is begging to be allowed to construct a 2nd runway for decades but is not allowed by the government.

      Delete
    4. Anonymous12:52

      Also, Gatwick does have another runway, but as in Belgrade now, no simultaneous operations allowed ...

      Delete
    5. Anonymous21:41

      So shortsighted for BEG. LGW wants a second runway but can’t get it because of land not being available. BEG had land available and chose not to acquire it. That land is getting more snd more expensive by the day not to mention the risk of unplanned (divlja gradnja) or planned railway construction. This new runway project has been planned since 1950s. I saw the very first BEG plans and there was a general aviation runway planned for the other side of the airport road from Day 1. Such foresight then and none now!

      Delete
    6. Anonymous09:42

      SAW used to process almost 30k pax with a single runway and almost 100% narrow body craft .

      Delete
    7. Anonymous08:48

      Gatwick couldn't build a 2nd runway due to an agreement with the local council. Since the agreement expired, Gatwick submitted the application, which will be decided early next year.

      Delete
  3. Anonymous08:40

    All they needed was to buy 10m strip of land (~ 3 hectars) adjacent to the airport and shift the main runway by 20m to allow simultaneous operations

    ReplyDelete
    Replies
    1. Anonymous10:56

      Would that have been fully independent or would it only have allowed one for one runway for take off and one for landing?

      Delete

Post a Comment

EX-YU Aviation News does not tolerate insults, excessive swearing, racist, homophobic or any other chauvinist remarks or provocative posts with the intention of creating further arguments. A full list of comment guidelines can be found here. Thank you for your cooperation.