Skip to main content
  • Home

Search This Site

EX-YU Aviation News

EX-YU Aviation News

  • About
  • Vintage
  • Trip Reports
  • Newsletter
  • Support

EX-YU VINTAGE


JAT Dubrovnik flight ad, 1970

Labels

ACI Air Adria Airways Adria Airways Switzerland Adria Tehnika Air Croatia Air Montenegro Air Serbia Amelia International Archive files Banja Luka
Belgrade BH Airlines Bihać bosnia and herzegovina Bosnian Wand Airlines Brač Covid-19 croatia croatia airlines Dalmatian Dubrovnik ETF Airways European Coastal Airlines Feature Fleet Fly Air41 Airways FlyBosnia Focus GP Aviation Jat Airways Jat Tehnika jobs Kon Tiki Sky Kosovo Kraljevo Limitless Airways Livery Ljubljana Lošinj low cost airline macedonia Maribor Mat Airways MAT Macedonian Airlines montenegro montenegro airlines mostar MRO New route Newsflash Niš Ohrid Osijek Photo podgorica portorož Pragusa.One Priština Privatisation PROMO Pula Results 2008 Results 2009 Results 2010 Results 2011 Results 2012 Results 2013 Results 2014 Results 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results 2020 Results 2021 Results 2022 Results 2023 Results 2024 Results 2025 Results 2026 Rijeka Ryanair safety sarajevo Sea Air serbia service Skopje Sky Srpska slovenia Smile Air Split Summer 2009 Summer 2010 Summer 2011 Summer 2012 Summer 2013 Summer 2014 Summer 2015 Summer 2016 Summer 2017 Summer 2018 Summer 2019 Summer 2020 Summer 2021 Summer 2022 Summer 2023 Summer 2024 Summer 2025 Summer 2026 tivat ToMontenegro Trade Air Trebinje Trip report Tuzla Užice VLM Airlines Winter 2008/09 Winter 2009/10 Winter 2010/11 Winter 2011/12 Winter 2012/13 Winter 2013/14 Winter 2014/15 Winter 2015/16 Winter 2016/17 Winter 2017/18 Winter 2018/19 Winter 2019/2020 Winter 2020/2021 Winter 2021/2022 Winter 2022/2023 Winter 2023/2024 Winter 2024/2025 Winter 2025/2026 Winter 2026/2027 Wizz Air Zadar zagreb
Show more Show less

Archive

  • February53
  • January85
  • December89
  • November77
  • October84
  • September81
  • August80
  • July85
  • June80
  • May83
  • April80
  • March80
  • February73
  • January84
  • December81
  • November83
  • October83
  • September79
  • August80
  • July83
  • June76
  • May84
  • April81
  • March77
  • February78
  • January81
  • December83
  • November83
  • October84
  • September84
  • August87
  • July84
  • June80
  • May84
  • April79
  • March84
  • February75
  • January81
  • December79
  • November79
  • October80
  • September81
  • August81
  • July79
  • June79
  • May80
  • April75
  • March84
  • February76
  • January79
  • December83
  • November78
  • October78
  • September79
  • August86
  • July98
  • June99
  • May93
  • April93
  • March92
  • February83
  • January93
  • December94
  • November77
  • October80
  • September79
  • August79
  • July86
  • June84
  • May86
  • April82
  • March95
  • February74
  • January79
  • December82
  • November77
  • October84
  • September80
  • August82
  • July84
  • June75
  • May79
  • April76
  • March75
  • February73
  • January80
  • December80
  • November79
  • October77
  • September73
  • August70
  • July80
  • June75
  • May76
  • April72
  • March75
  • February71
  • January78
  • December74
  • November72
  • October75
  • September69
  • August65
  • July73
  • June73
  • May74
  • April67
  • March72
  • February64
  • January72
  • December73
  • November70
  • October70
  • September70
  • August56
  • July68
  • June72
  • May73
  • April56
  • March31
  • February29
  • January34
  • December31
  • November30
  • October31
  • September31
  • August31
  • July31
  • June30
  • May31
  • April30
  • March31
  • February28
  • January31
  • December31
  • November30
  • October31
  • September30
  • August31
  • July31
  • June30
  • May31
  • April30
  • March31
  • February28
  • January31
  • December31
  • November30
  • October30
  • September30
  • August31
  • July31
  • June30
  • May31
  • April30
  • March31
  • February28
  • January31
  • December32
  • November30
  • October31
  • September30
  • August31
  • July31
  • June30
  • May31
  • April30
  • March31
  • February29
  • January31
  • December31
  • November30
  • October31
  • September30
  • August31
  • July31
  • June30
  • May31
  • April30
  • March31
  • February28
  • January31
  • December32
  • November31
  • October31
  • September30
  • August31
  • July31
  • June30
  • May32
  • April31
  • March31
  • February28
  • January31
  • December31
  • November30
  • October31
  • September31
  • August31
  • July31
  • June30
  • May31
  • April30
  • March32
  • February29
  • January31
  • December30
  • November30
  • October31
  • September30
  • August30
  • July31
  • June31
Show more Show less


Belgrade Airport to reach 36 gates as expansion progresses

  • Get link
  • Facebook
  • X
  • Pinterest
  • Email
  • Whatsapp
  • Telegram
  • Reddit
  • Linkedin
  • Other Apps

Work on the expansion of Belgrade Nikola Tesla Airport is progressing with foundation work completed for the addition of three new gates, along with three new airbridges and four additional aircraft parking stands. The project will expand the terminal, creating more space for passengers and improving passenger flow in both departure and arrival zones. Upon completion of this development cycle, the airport will feature a total of 36 gates. The airport is adding new gates to the C wing of the terminal building - C15, 16, 17 and 18. While C15 - C17 will feature airbridges, C18, unlike adjacent stands, will be a non-contact (remote) gate, meaning travellers will not use a passenger boarding bridge but will be transported to and from the terminal by bus. The stand is designed to accommodate Code C aircraft, with a maximum wingspan of 36 metres.

The project also includes the construction of the connecting section of Taxiway T, linking stand C18 to the broader taxiway system and de-icing platforms, development of new service roads to allow circulation of ground handling vehicles and equipment around the new gates, installation of a dedicated stormwater drainage system, including slot drains, underground piping, connections to the main stormwater collector and partial reconstruction of existing drainage infrastructure, installation of external lighting infrastructure, including 22-metre-high lighting masts equipped with LED floodlights, new power supply cables, control systems and obstacle lighting, as well as the construction of apron pavement structures, including reinforced concrete slabs and multi-layer aggregate foundations designed for aircraft load-bearing operations. As part of the upgrades, four new travelators will be installed inside the terminal, two in departures and two in arrivals.



Commenting on the project, Belgrade Airport’s CEO, Chivoine Rem, told the “Bloomberg Adria” network, “So far, we have invested 360 million euros between 2019 and 2025 into the Belgrade Airport project. We have decided to keep investing in the development of the airport. We started work on further expansion in November [2025]. This will help us keep unlocking traffic development and airport capacity for the future”.

Operator VINCI noted, “We are in a new phase of investment in the development of Belgrade Nikola Tesla Airport. Construction is progressing steadily by VINCI Construction Grands Projects. Sustainability remains one of our key priorities. We are implementing modern, environmentally conscious materials and infrastructure solutions, all in line with our ambition to further strengthen Belgrade Nikola Tesla Airport’s role as a leading regional hub in Southeast Europe”.

Commenting on competition from nearby airports, Mr Rem noted, “It is hard to compare because the countries in the region are very different. On top of that, we are the only country in the region with a national airline that is building a hub. The model is very specific, with transfer passengers coming from all over the region”.





February 19, 2026
Belgrade Feature serbia
  • Get link
  • Facebook
  • X
  • Pinterest
  • Email
  • Whatsapp
  • Telegram
  • Reddit
  • Linkedin
  • Other Apps

Comments

  1. Anonymous09:01

    I notice in the photos that there is also work on the other side of the terminal next to the highway. What are they doing there?

    ReplyDelete
    Replies
    1. Anonymous09:06

      I am also wondering. It would have been smart to add gates on that side too.

      Delete
      Replies
        Reply
    2. Anonymous10:40

      JU HQ probably?

      Delete
      Replies
        Reply
    3. Anonymous10:42

      JU HQ is not located directly in front of the terminal. It's across the road. The photos show construction work directly in front of the terminal building.

      Delete
      Replies
        Reply
    4. Anonymous17:09

      I believe it’s that park with all the airplanes and greenery that was in the renderings

      Delete
      Replies
        Reply
    5. Anonymous17:16

      True. That's a possibility

      Delete
      Replies
        Reply
    6. Reply
  2. Anonymous09:03

    When is it expected to be completed?

    ReplyDelete
    Replies
    1. Anonymous09:11

      It needs to be operational by start of 2027 summer season.

      Delete
      Replies
        Reply
    2. Anonymous09:50

      Hopefully the shops will be allowed to open by then.

      Delete
      Replies
        Reply
    3. Anonymous10:22

      Fingers crossed for JU's new lounge. They have to be operational for EXPO volume of traffic!

      Delete
      Replies
        Reply
    4. Anonymous10:50

      +1

      Delete
      Replies
        Reply
    5. Reply
  3. Anonymous09:03

    From C17 to passport control will take one hour :D

    ReplyDelete
    Replies
    1. Anonymous09:19

      Imagine first taking a bus from your aircraft to C18 and then try to reach the main terminal with the travellators IF they are all operational!

      Delete
      Replies
        Reply
    2. Anonymous09:20

      Highly unlikely that the bus from C18 will drop you of at C17. They usually take you down to C1.

      Delete
      Replies
        Reply
    3. Viktor09:27

      In January I had a connecting flight from Amsterdam to SKP.
      The A320 from AMS was parked arround Gates C11/12 and the connecting fligh to Skopje was at gate C13. I had to make a circle walking first down the arrival zone,-> than via security and dutyfree-> than climb and come back to almost the same spot on the departure C gates. This took me probably arround 15-20 minutes.
      BEG felt like FRA.

      Delete
      Replies
        Reply
    4. Anonymous09:30

      ^ unfortunately because you had to go through security. Otherwise you would have been able to just enter the C gates wing straight away.

      Delete
      Replies
        Reply
    5. Anonymous09:43

      ^ That is only possible on domestic flight or intraSchengen area flights.
      When we join the E.U. that would be possible at BEG.

      Delete
      Replies
        Reply
    6. Anonymous09:53

      It's not only on intra Schengen flight (how would the gate agent know which flight you are transferring to). You can enter the gate area immediately from the plane depending on the destination you are coming from. I think passengers arriving from all EU destinations can enter the gate area straight away.

      Delete
      Replies
        Reply
    7. Anonymous10:08

      09:53 Completely right, I could enter the gate area anytime I connected from EU to Sarajevo via BEG. Other way around is still not possible because Bosnia is not in the One Stop Security program yet, but people tell me same applies to Montenegro flights in BEG, even though they're a part of OSS.

      Delete
      Replies
        Reply
    8. Anonymous11:21

      More information about OSS countries

      https://online.flippingbook.com/view/183113574/124/

      Delete
      Replies
        Reply
    9. Anonymous12:03

      Bravo E.U.

      Delete
      Replies
        Reply
    10. Anonymous12:21

      Actually you were supposed to be able to enter the departure zone directly at gate C12 and take a short walk to your gate. Either there was no one there, or it might be that you’ve taken a wrong turn at the gate - there is signage “Transfer” and “Exit Belgrade” at each gate. To end up on top floor you would have to take the Exit Belgrade route.

      This is available only for flights from OSS countries, but AMS surely fits the description (unlike SKP).

      Delete
      Replies
        Reply
    11. Reply
  4. Anonymous09:06

    Where can the airport be expanded after this?

    ReplyDelete
    Replies
    1. Anonymous09:09

      A side of the building. Knock down the cargo depot and expand all the way there.

      Delete
      Replies
        Reply
    2. Anonymous09:20

      That should have been done from the start. It just makes sense.
      Continuously expanding C gates doesn't

      Delete
      Replies
        Reply
    3. Anonymous09:21

      +1
      The old Cargo depot should be replaced by a passenger terminal. In fact BEG should built a new both cargo terminal and the platform from the scratch, question is where.

      Delete
      Replies
        Reply
    4. Anonymous09:21

      It would also make A wing extremely long. Same as C gates.

      Delete
      Replies
        Reply
    5. Anonymous09:25

      They could add gates on the other side of the C wing if they wanted too.

      Delete
      Replies
        Reply
    6. Anonymous09:31

      ^^ I suspect there wont be significant expansion after this until the time comes to start again with a better shaped terminal in the ealy 2040s.

      Delete
      Replies
        Reply
    7. Anonymous09:46

      Will Vinci be part of the concession then?

      Delete
      Replies
        Reply
    8. Anonymous09:48

      @09:46 hope not 🫣

      Delete
      Replies
        Reply
    9. Anonymous09:53

      VINCI concession commenced in 2018 and runs for 25 years.
      I doubt they will build us a new terminal and then handle back the airport to the state in 2043.
      Till then we are stuck with what exists currently plus small improvements wherever they can find free space.

      Delete
      Replies
        Reply
    10. Anonymous09:55

      "VINCI secured an additional year and a half on its 25-year concession of the airport, as part of force majeure compensation resulting from operations which were severely impacted by the coronavirus pandemic."
      https://www.exyuaviation.com/2024/04/belgrade-airport-to-open-overhauled.html

      Delete
      Replies
        Reply
    11. Anonymous11:01

      So no major redesign of the airport will begin until at least 2045...

      Delete
      Replies
        Reply
    12. Anonymous11:03

      The airport has just gone through a major redesign and looks nothing like it used to.

      Delete
      Replies
        Reply
    13. Anonymous11:16

      The 1980s is not the benchmark. It is the other similarly sized airports in Europe in the 2020s.

      Delete
      Replies
        Reply
    14. Anonymous11:41

      Who said anything about the 1980s? Although parts of the airport have a fun 1980s vibe still

      Delete
      Replies
        Reply
    15. Anonymous11:53

      ^ Except for Terminal 1 which is being kept in its original look there is no part of the airport that gives a "1980s vibe" at all.

      Delete
      Replies
        Reply
    16. Anonymous13:09

      Airport has two terminals, how you can say "except for terminal 1" :) Btw, I like 80s vibe.

      Delete
      Replies
        Reply
    17. Anonymous13:12

      Because terminal 1 consists of check in desks only and nothing else. It is protected as a cultural monument and can't be changed even if someone wanted to. No other part of the airport has a 1980's vibe and even T1 does not have an 80s vibe since it was built 20 years earlier.

      Delete
      Replies
        Reply
    18. Anonymous13:24

      If they relocate access road they can build new north wing gates alongside with new terminal and connect it to C gates. Also relocating cargo terminal can probably open space for new 4-5 gates.

      Delete
      Replies
        Reply
    19. Anonymous16:04

      @^ 11:53 behind the scenes for staff it really remains fairly 80s, also some parts really dont look very 2020s. But irrespective its hardly a masterpieace.

      Delete
      Replies
        Reply
    20. Reply
  5. Anonymous09:09

    If Air Serbia keeps growing traffic, they will need to expand much more than this.

    ReplyDelete
    Replies
    1. Anonymous09:11

      +1

      Delete
      Replies
        Reply
    2. Anonymous12:46

      JU should try expanding the 2 smaller waves at 10am and 8pm.

      Delete
      Replies
        Reply
    3. Reply
  6. Anonymous09:17

    The C wing already feels like a marathon walk. Can't imagine with these extra gates.

    ReplyDelete
    Replies
    1. Anonymous09:20

      True dat.

      Delete
      Replies
        Reply
    2. Anonymous09:23

      +1
      A whole corridor cross section is already narrow and with this expansion it will look like a tunnel. Quite a walk to/from the most remote gate.

      Delete
      Replies
        Reply
    3. Anonymous09:36

      ^^ the whole terminal is quite a mash-up. The walk is relatively long for an airport of this size but tbh mostly i find it takes no more than 20minutes from deboarding to exit nowadays which is not bad. That being said one can exit airports such as Heathrow Terminal 5 often even faster.

      Delete
      Replies
        Reply
    4. Anonymous09:49

      They should have completely redesigned the terminal, cargo area, maintenance hangar, parking spaces.
      This is just trying to add gates wherever they can find some space which isn't very efficient or user friendly.

      Delete
      Replies
        Reply
    5. Anonymous09:54

      +1 they 'should' have started again with a far better orientation for a terminal. However as they didnt they have to make do. Tbh most passengers through Belgrade Airport wont really notice some of the design flaws. Rather they'll be excited to travel so ultimately its about dealing with volume until such time that its clear a whole new terminal will be required because the current method of adaptation extension has its limits.

      Delete
      Replies
        Reply
    6. Anonymous09:57

      Pretty much anyone that is not a frequent traveller is impressed with the terminal. I hear it all the time especially when they compare it to what it looked like. I have a few foreigner friends who came at the end of last year. They were here last time more than 5 years ago and they couldn't believe it's the same airport. For us frequent flyers or those following this expansion it's a different story.

      Delete
      Replies
        Reply
    7. Anonymous11:39

      'Impressed' is perhaps being generous. Improved definatly, but there is little impressive about the work done from an architectural perspective.

      Delete
      Replies
        Reply
    8. Anonymous11:53

      Pretty much anyone who compares the airport to what it was like in the 1990's and travels by airplane extremely rarely is impressed.
      Everyone else who is visiting other modern airports in the rest of Europe is not.

      Delete
      Replies
        Reply
    9. Anonymous11:54

      Yes they are impressed because the airport was dreadful before and it was hardly an architectural masterpiece either.

      Delete
      Replies
        Reply
    10. Anonymous11:55

      I am sure anon @ 11.53 did a poll and knows exactly what "everyone else visiting" thinks.

      Delete
      Replies
        Reply
    11. Anonymous12:01

      @11:53 unlikely, considering the passenger levels during the 1990s - not even than many Serbs used the airport during that decade, let alone foreign visitors. People compare experiences at airports. Belgrade Airport is defiantly not dreadful, and I think most people here would agree on that. Its often really fast to transit, its relatively clean etc. But I agree with many observations that lots of missed opportunities are there. But I do not think many people compare with the 1990s.

      Delete
      Replies
        Reply
    12. Anonymous12:05

      Most people here complain, cry and spit on everything. No matter the country and no matter the topic.

      Delete
      Replies
        Reply
    13. Anonymous13:14

      I miss smoking place... With hub ambitions I think it's still enough time to make it. There are crazy people like me who care about that and skip AMS transfers prefering amazing Zurich lounges...

      Delete
      Replies
        Reply
    14. Anonymous15:04

      It amazes me that BEG has gone from 2 smoking areas to 0.

      Delete
      Replies
        Reply
    15. Anonymous16:06

      It amazes me that airports anywhere retain such a disgusting space

      Delete
      Replies
        Reply
    16. Reply
  7. Anonymous09:18

    Out of curiosity, how many gates does BUD have?

    ReplyDelete
    Replies
    1. Anonymous09:22

      Don't know but it had 19.6 million pax last year!

      Delete
      Replies
        Reply
    2. Anonymous09:23

      67 gates

      Delete
      Replies
        Reply
    3. Anonymous09:31

      Thank you

      Delete
      Replies
        Reply
    4. Anonymous12:41

      Much less than that.

      Delete
      Replies
        Reply
    5. Anonymous13:32

      BUD has 17 airbridges. Belgrade will have 27 after completition.

      Delete
      Replies
        Reply
    6. Anonymous13:38

      No need for airbridges in that odd LCC hangar at BUD. Although I haven't been there for 5+ years, could be they don't use it any more...

      Delete
      Replies
        Reply
    7. Reply
  8. Anonymous09:36

    Feels like BEG has been under construction non-stop for years now. Looking forward to a “finished” version.

    ReplyDelete
    Replies
    1. Anonymous09:38

      Perhaps its a synonym for so much in the region..functiomally unfinished has a degree of beauty hihi

      Delete
      Replies
        Reply
    2. Reply
  9. Anonymous09:36

    Why is the bus gate is the farthest one? It doesn't make sense...

    ReplyDelete
    Replies
    1. Anonymous09:37

      What do you mean? Where would they put the bus gate? At C15 and then continue with air bridge gates?

      Delete
      Replies
        Reply
    2. Anonymous10:24

      Somewhere near the passport control, maybe on lower level. Or at least at A gates. It's cruel to make people walk to C18 only to put them on a bus.

      Delete
      Replies
        Reply
    3. Anonymous12:47

      The stand is at C18, the gate for people to board there will not be at C18 but at existing bus gates. Similarly to B gates that are remote stands or A11 for Niš.

      You board for example at C10A-E and the bus takes you to some remote stand, B positions, A11 or C 18

      Delete
      Replies
        Reply
    4. Anonymous12:50

      The biggest annoyance with the bus gates is the arrivals. The A4 entrance is really poorly designed.

      Delete
      Replies
        Reply
    5. Anonymous13:49

      The main thing with bus gate is it mainly serves ATRs which mainly serve short regional routes which are important for JU's business. Those gates should be easiest to reach with quickest procedure. Additional nightmare is checking in during morning wave for, say, Montenegro in the same JU lane with pax for AMS, CDG (...) who are there in massive numbers. At the end, I must come even before for short Balkan flight than when travelling to non-ATR destinations, which is discouriging.

      Delete
      Replies
        Reply
    6. Anonymous15:02

      Check in at BEG for JU flights is quite decent compared to many other major airports in Europe, fast and efficient even during peak times. Organisation of remote stand gates is a different story. Those gates would of been better around the gate C6 area with 10 gates rather than 5.

      Delete
      Replies
        Reply
    7. Reply
  10. Anonymous09:37

    Hope they also invest in more seating areas and charging points.

    ReplyDelete
    Replies
    1. Anonymous09:43

      I've always found that quite good in the airport. I stuggle with the lack of good air conditioning during the summer. But seating with a view i find is really good.

      Delete
      Replies
        Reply
    2. Anonymous11:02

      saw on some asian airports that they have "small" fountains like areas where people can chill around, like quite area. Never saw this on any airport in Europe.

      Delete
      Replies
        Reply
    3. Anonymous11:13

      They have created a relatively nice area at the so called "Tesla Square", with some trees, tables with chargers and seating. When the restaurants around it which are ready and set to open for the past year finally open it will be even nicer.

      Delete
      Replies
        Reply
    4. Reply
  11. Anonymous10:44

    I think one passport control and one security checkpoint at BEG are not enough. Maybe build a new terminal in the middle of the C wing or something else because its not convenient to walk from the terminal all the way to the end of the C wing.

    ReplyDelete
    Replies
    1. Anonymous11:04

      +1000

      Delete
      Replies
        Reply
    2. Anonymous13:00

      -10000

      maybe when beg has 30 mil pax that would make sense

      Delete
      Replies
        Reply
    3. Anonymous13:30

      It doubles the costs, so no way at this moment.

      Delete
      Replies
        Reply
    4. Anonymous14:54

      What would be more useful is perhaps a smaller transit control point made somewhere in the C wing to allow for a faster transit experience.

      Another thing that they should of implemented is another access from the A wing to passport control.

      Delete
      Replies
        Reply
    5. Anonymous16:07

      @13:00 22nd century planning indeed

      Delete
      Replies
        Reply
    6. Reply
  12. Anonymous11:28

    I get the expansion, I get 'they' had to compromise with Vinci and we got 'not Whoaa design' which is better than what we had. What I do NOT get is why the heck are restaurants still not open while they are nearly all done? Don't give me 'paperwork' problems, as it is BS. Its more than that. Embarrassing.

    ReplyDelete
    Replies
    1. EX-YU Aviation11:37

      It is a paperwork issue.

      Delete
      Replies
        Reply
    2. Anonymous11:40

      Paperwork or not, its not good enough.

      Delete
      Replies
        Reply
    3. Anonymous11:59

      Literally on every topic same thing. I am unhappy about it too but you have been told about it and the reason. Asking every single time won't change it. I also find it interesting as if many here go to the airport purely to shop for Victoria secret underwear which is awaiting to open.

      Delete
      Replies
        Reply
    4. Anonymous12:14

      Isnt the owner of Victorias Secret connected to Epstein

      Delete
      Replies
        Reply
    5. Anonymous13:56

      Yes.
      I will never shop there.

      Delete
      Replies
        Reply
    6. Anonymous20:32

      It is a paperwork issue, as EX-YU said. As we know, where there is a will, there is a way. There was a will to legalize very large number of real estate objects using simplified paperwork, but it seems there is no will for those airport stores. It shouldn't be hard to find out if approvals are rejected based on significant issues, or just based on some typos and other irrelevant errors, and if so, who is rejecting them.

      Delete
      Replies
        Reply
    7. Reply
  13. Anonymous14:08

    Vinci and its Belgrade management behave as if BEG is Changi. They are doing a poor job and the concession should have gone to the Koreans. We all remember how Macron visited Serbia before the end of the concession selection process.

    ReplyDelete
    Replies
    1. Anonymous16:08

      +1

      Delete
      Replies
        Reply
    2. Anonymous18:08

      Let alone they took over BUD which is in the vicinity.

      Delete
      Replies
        Reply
    3. Reply
Add comment
Load more...

Post a Comment

EX-YU Aviation News does not tolerate insults, excessive swearing, racist, homophobic or any other chauvinist remarks or provocative posts with the intention of creating further arguments. A full list of comment guidelines can be found here. Thank you for your cooperation.

VINTAGE EX-YU


JAT Dubrovnik flight ad, 1970

POPULAR THIS WEEK

Image

Wizz Air to launch two new Skopje routes

Image

Belgrade’s Aeronautical Museum readies for overhaul

Image

Wizz Air to base seventh aircraft in Skopje and grow operations

Image

Ryanair outlines Croatia plans amid €3.3 million airline boost

Powered by Blogger
© EX-YU Aviation News 2008 - 2026