Skip to main content
  • Home

Search This Site

EX-YU Aviation News

EX-YU Aviation News

  • About
  • Vintage
  • Trip Reports
  • Newsletter
  • Support

EX-YU VINTAGE


Aviogenex ad
"550.000 foreign tourists in 1985"

Ljubljana Airport begins terminal tender

  • Get link
  • Facebook
  • X
  • Pinterest
  • Email
  • Whatsapp
  • Telegram
  • Reddit
  • Linkedin
  • Other Apps
NEWS FLASH


Fraport Slovenia, the operator of Ljubljana Jože Pučnik Airport, has launched tender procedures for the construction of its new multi million euro passenger terminal. The deadline for the submission of bids has been set for November 15. Construction is due to begin next year and scheduled for completion in 2020. The new facility will be located to the north-west of the existing terminal. The two will be joined to form a single functioning unit. The tender documents require for the contractor to build the new structure, undertake partial construction work in the existing terminal, build road infrastructure around the new facility and partially demolish the administrative building. The new 10.000 square metre terminal, valued at sixteen million euros, will feature a departures hall with 22 check-in desks, five security lanes, three baggage reclaim carousels, a new baggage sorting area, a large duty free shop, a new premium lounge, as well as new food and beverage facilities.

Draft floor plan of the terminal - ground level

Draft floor plan of the terminal - first level


October 23, 2018
Ljubljana Newsflash slovenia
  • Get link
  • Facebook
  • X
  • Pinterest
  • Email
  • Whatsapp
  • Telegram
  • Reddit
  • Linkedin
  • Other Apps

Comments

  1. Anonymous14:05

    I doubt that the pictures above represent the final version. The render of the terminal in the first picture does not add up with the plans in the second and third picture (e.g. the hallway and the inner "park" are missing from the plans).

    ReplyDelete
    Replies
    1. Anonymous14:23

      Fraport decided to keep final project documentation (including floor plans) a secret for "security reasons". A bit surprising since it was publicly available in 2012 when the original tender for T2 was published.

      Delete
      Replies
        Reply
    2. Anonymous15:19

      Yes, I'm aware of that. In 2012, the rules on public procurement did not allow the contracting entities to limit access to the tender documentation, as they do now. My comment was only referring to the fact, that the pictures obviously do not show the same building at that at least one of them is incorrect.

      Delete
      Replies
        Reply
    3. EX-YU Aviation15:33

      The floor plans were released by Fraport Slovenia in 2017 and are available for download on the airport's website as part of tender documentation.

      Delete
      Replies
        Reply
    4. Anonymous15:45

      @15.19 you can actually see in the picture that these are Fraport's floor plans. It even says the date. Has nothing to do with 2012.

      Delete
      Replies
        Reply
    5. Anonymous17:15

      These floor plans were attached to a previous tender (30/06/2017) as a concept design. Final floor plans are not released, but based on final renders they should be significantly different.

      Delete
      Replies
        Reply
    6. Reply
  2. Anonymous15:14

    Not a moment too early. LJU airport has never, but really never been user friendly.

    ReplyDelete
    Replies
      Reply
  3. Anonymous16:07

    Remarkable, regional acheivements and ambitions. Very good LJU.
    Looking forward to see JP doing long-haul very soon.

    ReplyDelete
    Replies
      Reply
  4. Unknown10:54

    Will they keep the old terminal or theyy will demolish it?

    ReplyDelete
    Replies
    1. Anonymous10:57

      They will keep it and renovate it.

      Delete
      Replies
        Reply
    2. Reply
  5. Anonymous15:07

    potrebna je adaptacija za SAAB200 avione, ma pozurite malo sa obnovom terminala

    ReplyDelete
    Replies
      Reply
Add comment
Load more...

Post a Comment

EX-YU Aviation News does not tolerate insults, excessive swearing, racist, homophobic or any other chauvinist remarks or provocative posts with the intention of creating further arguments. A full list of comment guidelines can be found here. Thank you for your cooperation.

VINTAGE EX-YU


Aviogenex ad
"550.000 foreign tourists in 1985"

POPULAR THIS WEEK

Image

Air Serbia granted permits for Beijing flights

Image

British Airways to suspend Zagreb service over winter

Image

Air Serbia upgrades capacity on new service

Image

Airlines plan five new subsidised routes from Sarajevo in 2026

Image

Belgrade Airport prepares for new terminal expansion

Powered by Blogger
© EX-YU Aviation News 2008 - 2025