NEWS FLASH
Ljubljana Jože Pučnik Airport’s new passenger terminal Is readying for its opening, with all new equipment now installed. The terminal is getting its finishing touches and testing procedures have begun. The 10.000 square metre facility features fourteen check-in desks, in addition to the eight at the existing terminal, as well as a special counter for bulky baggage, up to five security lanes, two baggage carousels with enough space for a third should it be required in the future, a new luggage sorting facility, large duty free shop, as well as a new premium lounge. Four new restaurants will be opened, as well as two stores selling Slovenian products. The terminal is expected to open by July.
Photos courtesy of Fraport Slovenija
It's gonna be one of the best looking museums I ever saw :)
ReplyDeleteAhahahahahahahahahah😂😂😂
DeleteGreat for Air Montenegro!
ReplyDelete5th Jetbridge Gate is built, right?
ReplyDeleteIt is.
DeleteCool. Thank you very much
DeleteI really wonder if these news are published to make fun of Ljubljana Airport (admit it, expanding terminal capacity while the traffic disappears almost completely and not expected to return back in near future is hilarious).
ReplyDeleteTraffic will return. Just wait until Summer. In the US I can confirm you that Domestic traffic is already in high numbers again. I work for a US Carrier and I see their domestic loads. Another couple weeks, perfectly timed with the opening of the new Terminal, pax flows will return again.
DeleteI think it was right decision to build it. New terminal is for next 30 years not for today. But hope for new flights soon. Menegers should be very active and open minded. They should find financal options to get new flights. So many small airports are getting new flights, but not Ljubljana.
DeleteAnd we all going to fly from Zagreb with Ryanair and Wizzair.
DeleteWill the existing terminal get an upgrade? Redesign on the outside at least?
ReplyDeleteRefurbishing the commie 60's look?
Yes, old one will be renovated. I think they said 2023 or 2022. Because next half of the year slovenia will have a lot of brussels flights.
Delete11.05.2021 Interim Figures Q1/ 3M Frankfurt
ReplyDeleteI guess they are not good as they are pushing a positive news first.
airport LJU brake even point in 2020 was 500.000 pax, with additional fix cost (new terminal) it is expected that brake even point is much higher.
DeleteQ1 pax 18000 ,95% drop compared to q1 2019,
Q1 loss 2.1mil